Challenge – All 29 houses needed to be insulated and screeded ready for the finished floor application. The traditional option for this is a labour intensive, high wastage and requires a lengthy & intensive planning process. This left the site looking for other options as they wanted this project completed in the highest quality and in the most efficient way possible.
Our Solution – A one stop shop for insulation and screed, with full accreditations, providing manufacturing, delivering and installation. A hassle-free process, with reduced wastage and a more efficient option, with reduced time on site and ensuring there is no delay in completion.
Ultrabead – our liquid insulation bead screed, fully encapsulates service pipes, reducing cold bridging, ending with a more uniformed finished product.
Ultracem – our liquid cement-based screed is self-levelling, reduced drying times, so the finished flooring can be applied sooner.
The Result – By delivering a fully integrated system from insulation preparation to finished floor level, RTU enabled the contractor to focus on other critical areas of the build, streamlining the overall construction process.
This all-in-one package offered multiple benefits: significantly reduced on-site labour requirements, minimised material wastage, and the confidence of a factory-controlled product installed to the highest standards. Unlike traditional floor build-up methods, the RTU solution provided both consistency and efficiency - ensuring quality was never compromised